Roof and Wall Panels
- 26 Gauge. Metal is offered in 23 different colors with a 20-year-warranty on most colors. (Crimson Red: 3/5 year warranty.)
Trim
- 24 Gauge Metal in 23 different colors with 20 year limited warranty on most colors. Crimson Red: 3/5 year warranty.)
Purlins
- 14 Gauge. Metal, either galvanized or prime.
Post
- Sizes range from 4 1/2 inch to 9 5/8 inch casing to I-beam.
- Our post are set from 5 ft. to 8 ft. deep with either a 14" or 20" augur, depending on the post size, for a durable structure to withstand heavy winds for the area of the building.
- If building is being built on a cement slab, 1/2" anchor plates will be set in slab for posts to be welded to.
Trusses
- Made from 2 3/8 inch tubing to 3 1/2 inch tubing to I-beam as needed for the size of the building and customer's preference.
Additional Materials
- All of our structure is sandblasted and painted twice with oil based red oxide primer to eliminate rust. Structure can be painted silver upon request.
- In addition to our buildings we install extra bracing to the roof and walls of our larger buildings to help withstand heavy winds.
- See our buildings under the structures header to see further details. We want to build a strong and durable building to satisfy our customers for years to come.
Optional Materials
- Windows
- Skylights
- Overhead Dorrs
- Walk Doors
- Slide Doors
- Vents
- Cement Foundation
- Rough Plumbing
- Insulation
- Overhead doors
- Roof Vents
Post Construction Materials
- If trailer or trash dumpster is not furnished, building scrap materials will be stacked in a neat pile and left on the jobsite. Goebel Welding & Construction will not haul off scrap materials as they are paid property of the new building owner.
- If trailer or trash dumpster is furnished, Goebel Welding & Construction will be happy to stack scrap building materials on the trailer or in the dumpster for owner to haul off at their convenience.
- If the building is being built in city limits, owner must furnish city permit, trash dumpster, portable restroom, and builders risk insurance policy to protect themselves from theft of purchased products.
- A leveled location should be furnished before Goebel Welding & Construction arrives at job. We can assist you in this.
cement slab
- 12" x 24" outside beams (unless specified different between landowner and GWC)
- 12" x 18" cross beams (unless specified different between landowner and GWC)
- (4) 5/8" rebar's in beams
- 1/2" rebar lapped and tied 12" on centers
- Black plastic laid throughout entire slab
- 3,000 PSI concrete
|
|